RF Course

Tech-Vidhya Certified RF I&C Engineer


Course Objective:
The course aims to aware candidates about BTS & MW site installation, commissioning, integration & testing and provide them with an in depth knowledge of complete cell site and GSM & MW Technology. 

Course Overview:
This training program is designed to give comprehensive overview of Communication system, GSM system & CDMA system to the candidates. In the later phase, training will be based on practical lines for telecommunication which constitutes giving the brief ideas of telecom terminologies and equipments used at cell site. After the completion of training, candidates will familiarize with various RF Segment such as RF survey, Civil work, Installation and Commissioning, AT, Quality Audit, Health and safety precaution etc. Training program also includes enhancing management capabilities of our candidates by putting them in group discussions, this will help our trainees to go for managerial positions in the Telecom sector.The course ends with the practical in lab and practical "on site" so that candidates will get live on-site working experience.






Course Contents: 
Module-A : Introduction to communication

History of communication, What is GSM, Evolution of GSM, Fundamentals of GSM, GSM Architecture, Understanding GSM channels, Call flow in GSM system, Radio interface, advantages of GSM, GSM traffic management, GSM transmission, GSM 900/1800/1900, What is CDMA, Evolution of CDMA, spread spectrum techniques, CDMA system architecture. 




Module-B : About the Cell Site & Outdoor Equipments 
What is cell site, Introduction & classification of cell site, Telecom Towers, Diesel Generator, Shelters, AMF panel, Earthing Pits, Lightning Arrestors, Aviation Lamps, Pole Mounts, Outdoor Cable Trays (HCT & VCT), GSM Antenna & Accessories (Tilt Arrangement, Antenna Clamps etc.), RF cables & Accessories (RF cables, Jumper cables, RF connectors, RF Clamp, RF Earthing Kits, Whether proofing Kits, TMB, TMA & Surge Arrestors etc.)



Module-C : About the Indoor Equipments 
Introduction-classification-Working Principle-Manufacturer of Roxtec, Cable tray (indoor-HCT),Servo-stabilizer, Power Interface Unit, Power Plant, Air-conditioner, Battery Bank, Alarm panel, ACDB, DCDB, DDF, IGB, Transmission Rack etc.








Module-D : Introduction to MW Communication system
Introduction to Microwave, MW Frequencies Band, Propagation Used, LOS Principle, Fundamental of LOS survey, Why we used MW communication system in GSM Network, Basic Design of MW Antenna, Different Parts used in MW Antenna, Block Diagram of MW communication System, E1’s Fundamental, E1 Capacity of MW communication system, Different Types of MW communication system, Data required to install & Align MW Antenna, Installation Process, Alignment Process, Terminology used in MW communication system etc.



Module-E : Introduction to Fundamental BTS 
Introduction to BTS, Fundamental Block diagram of BTS, Different cards/module of BTS, Functionality of each cards/module in BTS, Fundamentals of Diversity Technique, Sectorization in BTS, Career configuration in BTS, Alarms of BTS, Terminology used in BTS etc.







Module-F : Tools & Test Equipments Used for  BTS/MW I&C
Introduction-Specification & Use of Tools (Spanners, Screw Drivers, Hammers, Cutters, Crimping Tools, Knife, Hack Saws, Drill Machine, Soldering iron, Tilt Meter, Compass, RF Cutter, Sprit Level, Allen Key, Rope, Pulley etc.), Test Equipments (Laptop, Power Meter, VSWR Meter, Site Analyzer, BER Meter etc.) Health & Safety Tools (Helmet, Safety Belt, Gloves, Boot, First Aid Box etc.) 





Module-G : I &C of BTS/MW and Associated Equipments 
RF Survey, Finalization of tool kit according to work, List of materials used at sites, Unpacking of materials, Initial reporting from site, Installation process, Finalization of Installation, VSWR measurement of RF cable, Commissioning of MW, Alignment of MW, BTS commissioning, Integration of cell site, Alarm Testing, Call Testing, Call Handover Testing, Preparation of Site Documents, Punch points check list etc.  



By the end of this course candidates will be able to:
  • Talk about cell sites and GSM & MW Technologies.
  • Handle equipments used at cell site. 
  • Understand functionality of BTS as well as MW. 
  • Understand functionality of Battery Bank & Power Plant etc used at sites. 
  • Install-commission and align MW link by himself.
  • Install, commission and Integrate BTS Sites.  
  • Check site Installation as well as commissioning quality. 
  • Manage installation as well as commissioning team and make documents for the sites. 
Method of Training:
Providing well designed training material to all the candidates, Lectures by qualified & highly experienced trainers.We Provide elaborate classroom study for 6 weeks and 4 weeks for lab/on site field study, Group discussions, Question & Answer. The candidates are thoroughly assessed during the training by regular written test and interviews and finally ranked according to their performance.

How to Apply:
Fill online registration form and make a payment of Rs. 551/- (Registration fee for Indian resident only) by different payment options or Download registration form, fill it and send it along with the D.D./cheque (in the favors of “Aayan Infratel Pvt. Ltd.” payable at Jaipur) or visit our training center.

Misc Information:
Course Code   :    T-V/WT/C001

Duration           :    75 days 

Mode               :    Regular/ Classroom/Lab/On site
Eligibility           :    BE/B. Tech/Diploma Engineers in (ECE/EEE/CS/IT) 
Placement         :    100%  placement 
Certification By :    Tech-Vidhya




Contact Information:
Email :      training@aayaninfratel.com

Mobile :      +91-9785705947

APPLY NOW



Related Posts Plugin for WordPress, Blogger...